inside the roll with paper tube to reduce the pressure while loading; then wrapped with plastic film as well as woven bag on the finished roll, final loaded in the strong wooden case.
Hafen
Tianjin
Lieferfähigkeit
Lieferfähigkeit
1000 Quadratmeter/Quadratmeter per Week silber Drahtgeflecht